Boeing Whistleblower: Production Line Has “Enormous Volume Of Defects” Bolts On MAX 9 Weren’t Installed::A reader at respected airline industry site Leeham News offered a comment that suggests they have access to Boeing’s internal quality control systems, and shares details of what they saw regarding the Boeing 737 MAX 9 flown by Alaska Airlines that had a door plug detach inflight, causing rapid decompression of the aircraft. The takeaway appears to be that outsourced plane components have so many problems when they show up at the production line that Boeing’s quality control staff can’t keep up with them all.

  • Holyginz@lemmy.world
    link
    fedilink
    English
    arrow-up
    14
    arrow-down
    1
    ·
    11 months ago

    What’s his nuts saying he changed Boeing so it was run like a business instead of an engineering firm is precisely where things were guaranteed to go to shit. Wasn’t a matter of if, only when.